JBC Associates - Construction Management

  • Who We Are
  • What We Do
  • Our Work
  • JBC Blog
  • Careers
  • Connect

SR 222 – 22S Reconstruction and Roundabouts

Home » Our Work » SR 222 – 22S Reconstruction and Roundabouts

Sector: Roads
Location: Maidencreek Township, Berk Co., PA | Owner: PennDOT District 5-0 | Cost: $13 Million | Completion: 2022

After Tamarack Constitution SR222

Details: JBC was the Prime Consultant providing Construction Inspection services during the construction of SR 222-22S, SR 222/73 & Genesis Drive in Maidencreek Township. The project consisted of the full reconstruction of SR 222 from just south of the Willow Creek crossing, to just north of the Schaeffer Road intersection. The prior condition of this stretch of SR 222 was a single lane roadway in each direction with a shared turn lane; signalized intersections occurred at both SR 73 and at Genesis Drive/Tamarack Blvd, with a non-signalized intersection at Schaeffer Rd.

SR 222 Schaeffer Rd. In Construction

The newly reconstructed SR 222 included widening SR 222 from two lanes to four lanes and sometimes five for the full 2-mile length of the project to include two full travel lanes in each direction as well as the full reconstruction of the culvert bridge over Willow Creek. To improve traffic flow and make the roadway much safer, the signalized intersection of US 222/Genesis Drive was fully reconstructed as a modern roundabout. The non-signalized intersection of SR 222/Schaeffer Road saw the addition of a roundabout as well. The signalized intersection of SR 222 and SR 73 was widened on each leg, including installation of up-to-date signal equipment. The project included various stormwater management facilities and basins throughout the project limits.

Reconstruction and Roundabouts

Traffic roundabouts save lives, minimize accident injuries. Reduced speeds through the roundabout make the roadway much safer for vehicles, pedestrians and cyclists alike. With the advantage of slowing traffic and maintaining traffic flow, roundabouts are also better for the environment. Less idling has the added benefit of reduced vehicle emissions and fuel consumption.

Recognition

  • PennDOT District 5-0 — 2023 “Golden Boot Award” for Inspection Work During Construction. The award recognizes field inspection personnel who have demonstrated quality work and teamwork on a project and are nominated district wide by PennDOT assistant construction managers for overall project quality.


Road Projects

I-95 Corridor Improvement Projects
I-95 Corridor Improvement Projects
I-95/Cottman Ave. Emergency Bridge Replacement
I-95 Cottman Ave. Emergency Bridge Replacement
Betsy Ross Interchange, Section BR2
I-95 Revive: Betsy Ross Interchange, Section BR2
Lafayette Street Extension Project, Sections MGP, MGL, & MGN
Lafayette Street Extension
Langley Avenue Reconstruction at The Navy Yard
Langley Avenue Reconstruction at The Navy Yard
Pennsylvania Turnpike Open Road Tolling Conversion
Pennsylvania Turnpike Open Road Tolling Conversion
Route 29 All Electronic Toll Interchange
Route 29 All Electronic Toll Interchange
SR 0095, Section GR-1
SR 0095, Section GR-1
SR 222 - 22S Reconstruction and Roundabouts
SR 222 – 22S Reconstruction and Roundabouts
Browse Our Work

Connect

JBC Associates, Inc.
120 South Warner Road, Suite 100
King of Prussia, PA. 19406
610.992.9090

Contact Us

JBC Blog

  • Delivering Safer Roadways with Roundabouts
  • Celebrating Leadership and Inspiring the Future of Engineering
  • JBC Associates’ Commitment to PennDOT’s Relationships First Initiative

Site Search

LinkedIn  YouTube  WBENC

Copyright © 2026 · All Rights Reserved · Website by Brugler Design