Sector: Airports
Location: Philadelphia, PA | Owner: City of Philadelphia Division of Aviation | Cost: $36 Million | Completion: 2015

Details: JBC Associates provided Construction Management services including CPM Scheduling and Construction Inspection for this project involving the pavement replacement of an existing 9,500 feet long by 150 wide runway and replacement of the runway lighting systems. Construction was performed on a fully operational runway requiring the work to be performed at night and the runway to be restored daily to allow operations during the day.
In addition to performing Construction Inspection during the pavement reconstruction, JBC reviewed the contractor’s baseline schedule and subsequent schedule updates during construction and assisted the Airport in the review and analysis of delay claims asserted by the contractor post construction.