JBC Associates - Construction Management

  • Who We Are
  • What We Do
  • Our Work
  • JBC Blog
  • Careers
  • Connect

George Washington High School Renovation

Home » Our Work » George Washington High School Renovation

Sector: Education
Location: Philadelphia, PA | Owner: School District of Philadelphia | Cost: $12.2 Million | Completion: 2006

“School of the Future” High School

Details: This project consists of renovations to an existing 437,942 SF high school for 1600 students. Improvements consist of renovations to the science lab facilities and existing library, modifications for ADA compliance in toilet rooms and building accessibility, new roof, new bleachers, window replacement, painting, new HVAC and fire alarm systems, and site work.

JBC provided full time On-Site Owner Representation during construction of this project which was part of the overall $1.5 Billion Capital Improvement Program for the School District of Philadelphia.

 


Education Projects

Lincoln University Athletic Complex & Campus Site Improvements
College of Veterinary Medicine Class Expansion
George Washington High School Renovation
Holly Pointe Commons Student Residence
University of Pennsylvania Krishna Singh Center for Nanotechnology
School of the Future High School
SUNY Oswego Science, Engineering and Innovation Building
Strawberry Mansion High School Renovation
Browse Our Work

Connect

JBC Associates, Inc.
120 South Warner Road, Suite 100
King of Prussia, PA. 19406
610.992.9090

Contact Us

JBC Blog

  • Delivering Safer Roadways with Roundabouts
  • Celebrating Leadership and Inspiring the Future of Engineering
  • JBC Associates’ Commitment to PennDOT’s Relationships First Initiative

Site Search

LinkedIn  YouTube  WBENC

Copyright © 2026 · All Rights Reserved · Website by Brugler Design