Vine Street Overhead Bridges Reconstruction

Home » Our Work » Vine Street Overhead Bridges Reconstruction

Sector: Bridges
Location: Philadelphia, PA | Owner: Pennsylvania Department of Transportation District 6-0 | Cost: $65 Million | Completion: 2018

Details: The project included the replacement of seven existing structurally deficient bridge superstructures over the Vine Street Expressway, SR 0676 PAB, in Philadelphia. Project considerations included vertical clearance issues, reuse of existing bridge abutments, relocation of utilities supported by the bridges, and extensive landscape and streetscape finishes on the new structures. The replacements, planned to take place over a four-year period, considered the needs of motorists, pedestrians, and cyclists.

Stage 1 of the project began in March 2015 and was planned to be complete in time for the City’s planned Parkway Centennial Celebration starting in July 2017. During this stage, ten construction phases were required to maintain safe travel in the area and accommodate high-profile events. The first stage included four of the seven bridges over Interstate 676: the 20th Street /Benjamin Franklin Parkway Bridge, the Philadelphia Free Library Pedestrian Bridge, the 19th Street Bridge, and the Family Court Pedestrian Bridge. It also included the realignment of Winter Street. By completing crucial bridge construction activities at night, the contractors were able to meet schedule milestones without implementing additional detours or road closures that would inconvenience motorists.

Stage 2 consisted of the superstructure replacements on the 18th Street, 21st Street and the 22nd Street Bridges. The Contractor of the project proposed to start Stage 2 early and agreed to advance the completion of Stage 2 to November 2018, completing the work one year early.

JBC was the Prime Construction Inspection firm responsible for maintaining manpower and inspection staffing resources during daytime and nighttime construction activity throughout the project. Under a separate agreement with the Construction Management team for the project, JBC also provided critical CPM Scheduling services during construction.

Recognition:

  • ASHE Delaware Valley — 2018 Project of the Year Award Over $10 Million
  • National Steel Bridge Alliance “2020 National Award — Short Span”
    … for detailed project information:  open in new window www.aisc.org


Bridge Projects

Chestnut Street Bridges Rehabilitation Project
Chestnut Street Bridges Rehabilitation Project
SR 3010 PRR – 30th Street Station Bridge Rehab
30th Street Station Bridge Rehab
SR 422 Schuylkill River Bridge Replacement
SR 422 Schuylkill River Bridge Replacement
Susquehanna River Bridge Replacement
Susquehanna River Bridge Replacement
PAB Vine Street Expressway Overhead Bridges Reconstruction
Vine Street Overhead Bridges Reconstruction
SR 78-13M, Krumsville Interchange Bridge
SR 78-13M Krumsville Interchange Bridge
Browse Our Work

Connect

JBC Associates, Inc.
120 South Warner Road, Suite 100
King of Prussia, PA. 19406
610.992.9090

Contact Us

JBC Blog

  • Delivering Safer Roadways with Roundabouts
  • Celebrating Leadership and Inspiring the Future of Engineering
  • JBC Associates’ Commitment to PennDOT’s Relationships First Initiative

Site Search

LinkedIn  YouTube  WBENC

Copyright © 2026 · All Rights Reserved · Website by Brugler Design